ERC Resolution No. 37, Series of 2026 – New Rules for Off-Grid Electric Cooperatives’ Wheeling Rates
ERC adopted new rules establishing a standardized methodology for setting off-grid electric cooperatives’ wheeling rates, introducing group-based rate caps and annual adjustments to enhance regulatory efficiency, cost recovery, and consumer protection starting 2027.
10/23/20262 min read
SUMMARY
WHAT IT IS
This Resolution adopts a new regulatory framework and methodology for setting the distribution, supply, and metering (DSM) wheeling rates of off-grid electric cooperatives (ECs) for 2027–2032 and beyond.
All off-grid electric cooperatives, their customers (residential, commercial, industrial)
NEA
ERC
WHO IS AFFECTED
KEY DEADLINES
Rules effective 15 days after publication.
First regulatory period: 01 January 2027 to 31 December 2032; subsequent periods are six years each.
ECs must file rate applications within 20 days of effectivity; annual data/report submissions due every August.
TAKEAWAY
Off-grid ECs must prepare and file rate applications and comply with new reporting requirements.
ECs should review their cost structures and customer classifications to align with the new benchmarking and rate-setting methodology.
KEY POINTS
Scope: Applies to all off-grid Electric Cooperatives (ECs) in the Philippines.
Covered Entities: All off-grid ECs as defined under Presidential Decree No. 269, as amended.
Regulatory Period: First Regulatory Period covers 01 January 2027 to 31 December 2032; subsequent periods are six years each.
Requirements: ECs must file a rate application within 20 days from effectivity for rate translation of the determined tariff cap; annual data submissions are required by the 1st working day of August.
Thresholds: DSM Rate Caps and RFSC Caps are set per EC group, recalculated every six years, and adjusted annually for inflation and efficiency.
Compliance Obligations: ECs must submit operational, financial, and RFSC reports annually; non-compliance may result in penalties.
Mechanisms Introduced/Amended:
Introduction of the Rules for Setting Electric Cooperatives’ Off-Grid Wheeling Rates (RSEC-OGWR).
Classification of ECs into groups using K-means clustering based on cost drivers.
Annual adjustment of DSM rates via Tariff Glide Path (TGP) using an index for inflation/load growth and an efficiency factor.
Establishment of Reinvestment Fund for Sustainable Capital Expenditure (RFSC) with strict utilization and reporting requirements.
Standardization of customer classes: Residential, Low Voltage, and Higher Voltage.
Provision for special case additional tariff adjustments for unforeseen DSM costs.
Deadlines: Rate application within 20 days of effectivity; annual data/report submissions by 1st working day of August; new rates effective 15 days after publication.
Rate Setting: DSM Rate Caps determined per group based on median EC’s non-power cost per kWh; rates functionalized and allocated by customer class; annual public consultation required for rate cap recalculation.
DOWNLOAD FILE COPY
ERC Resolution No. 37, Series of 2026
Detailed policy analysis
Operational and compliance implications
Stakeholder impact assessment
Risk flags and ambiguities
Suggested next actions
PREMIUM REGULATORY ANALYSIS
Get access to:
Tags: Off-Grid ECs, Wheeling Rates, Benchmarking, Tariff Glide Path, RFSC, Rate Application