ERC Resolution No. 36, Series of 2026 – Revised Tariff Glide Path Rules for On-Grid and Off-Grid ECs

ERC adopted revised rules on the Tariff Glide Path mechanism for on-grid and off-grid electric cooperatives, updating the methodology for annual tariff adjustments and rate resets to better reflect current economic conditions and ensure timely, transparent rate setting.

10/23/20262 min read

SUMMARY

WHAT IT IS

Adopts revised rules for the Tariff Glide Path (TGP) for on-grid and off-grid electric cooperatives, prescribing the methodology, regulatory process, and timeline for periodic tariff adjustments and rate setting.

  • On-grid and off-grid electric cooperatives

  • ERC

  • NEA

  • PHILRECA

WHO IS AFFECTED

KEY DEADLINES

  • Takes effect 15 days after publication in a newspaper of general circulation or the Official Gazette.

  • Regulatory periods: 2027–2032 (2nd period for on-grid; 1st for off-grid), with resets and reviews commencing in January of the 6th year of each period.

TAKEAWAY

  • ECs must prepare for annual data submissions, tariff adjustment applications, and compliance with new benchmarking and reporting requirements as set by the ERC.

  • Stakeholders should monitor ERC issuances for annual tariff schedules and participate in reset and consultation processes.

KEY POINTS
  • Scope: Applies to all on-grid and off-grid Electric Cooperatives (ECs) regulated by the Energy Regulatory Commission (ERC).

  • Regulatory Period: Establishes a six-year regulatory period for both on-grid and off-grid ECs, with the next period set from January 1, 2027 to December 31, 2032.

  • Covered Entities: All on-grid and off-grid ECs, as defined under Presidential Decree No. 269, as amended.

  • Tariff Glide Path Mechanism: Prescribes annual tariff adjustments for ECs using a formula based on inflation (Index “I”) and an efficiency factor (“X”), subject to DSM tariff caps.

  • DSM Tariff Caps: Sets maximum allowable rates for Distribution, Supply, and Metering (DSM) charges, recalculated annually and at each regulatory reset.

  • Requirements: ECs must submit periodic data and information as required by the ERC for compliance and rate-setting purposes.

  • Thresholds: The “X” efficiency factor is set at 2.44% for the 2027-2032 period, but is zero in the first two years of each regulatory period, or under specified inflation/load growth conditions.

  • Deadlines: Annual tariff adjustments and rate schedules must be issued by the ERC on or before the end of the preceding year; reset activities commence in January of the 6th year of each regulatory period.

  • Compliance Obligations: ECs must comply with technical and performance standards per the Philippine Distribution Code and submit to periodic reclassification and rate resets.

  • Re-opening/Adjustment Mechanisms: Allows ECs to apply for amendments or suspension of rules in cases of force majeure or significant adverse legislative impacts; exceptions may be granted by the ERC for good cause.

DOWNLOAD FILE COPY

ERC Resolution No. 36, Series of 2026

  • Detailed policy analysis

  • Operational and compliance implications

  • Stakeholder impact assessment

  • Risk flags and ambiguities

  • Suggested next actions

PREMIUM REGULATORY ANALYSIS

Get access to:

Tags: Tariff Glide Path, Electric Cooperatives, Annual Tariff Adjustment, DSM Tariff Caps, Efficiency Factor, Regulatory Period

ConTACT US

hello@energypolicyhub.com