ERC Resolution No. 36, Series of 2026 – Revised Tariff Glide Path Rules for On-Grid and Off-Grid ECs
ERC adopted revised rules on the Tariff Glide Path mechanism for on-grid and off-grid electric cooperatives, updating the methodology for annual tariff adjustments and rate resets to better reflect current economic conditions and ensure timely, transparent rate setting.
10/23/20262 min read
SUMMARY
WHAT IT IS
Adopts revised rules for the Tariff Glide Path (TGP) for on-grid and off-grid electric cooperatives, prescribing the methodology, regulatory process, and timeline for periodic tariff adjustments and rate setting.
On-grid and off-grid electric cooperatives
ERC
NEA
PHILRECA
WHO IS AFFECTED
KEY DEADLINES
Takes effect 15 days after publication in a newspaper of general circulation or the Official Gazette.
Regulatory periods: 2027–2032 (2nd period for on-grid; 1st for off-grid), with resets and reviews commencing in January of the 6th year of each period.
TAKEAWAY
ECs must prepare for annual data submissions, tariff adjustment applications, and compliance with new benchmarking and reporting requirements as set by the ERC.
Stakeholders should monitor ERC issuances for annual tariff schedules and participate in reset and consultation processes.
KEY POINTS
Scope: Applies to all on-grid and off-grid Electric Cooperatives (ECs) regulated by the Energy Regulatory Commission (ERC).
Regulatory Period: Establishes a six-year regulatory period for both on-grid and off-grid ECs, with the next period set from January 1, 2027 to December 31, 2032.
Covered Entities: All on-grid and off-grid ECs, as defined under Presidential Decree No. 269, as amended.
Tariff Glide Path Mechanism: Prescribes annual tariff adjustments for ECs using a formula based on inflation (Index “I”) and an efficiency factor (“X”), subject to DSM tariff caps.
DSM Tariff Caps: Sets maximum allowable rates for Distribution, Supply, and Metering (DSM) charges, recalculated annually and at each regulatory reset.
Requirements: ECs must submit periodic data and information as required by the ERC for compliance and rate-setting purposes.
Thresholds: The “X” efficiency factor is set at 2.44% for the 2027-2032 period, but is zero in the first two years of each regulatory period, or under specified inflation/load growth conditions.
Deadlines: Annual tariff adjustments and rate schedules must be issued by the ERC on or before the end of the preceding year; reset activities commence in January of the 6th year of each regulatory period.
Compliance Obligations: ECs must comply with technical and performance standards per the Philippine Distribution Code and submit to periodic reclassification and rate resets.
Re-opening/Adjustment Mechanisms: Allows ECs to apply for amendments or suspension of rules in cases of force majeure or significant adverse legislative impacts; exceptions may be granted by the ERC for good cause.
DOWNLOAD FILE COPY
ERC Resolution No. 36, Series of 2026
Detailed policy analysis
Operational and compliance implications
Stakeholder impact assessment
Risk flags and ambiguities
Suggested next actions