ERC Resolution No. 35, Series of 2026 – Revised Rules for Setting Electric Cooperatives’ Wheeling Rates

ERC adopted revised rules for setting electric cooperatives’ wheeling rates, updating the ratemaking framework and rate reset process to enhance regulatory efficiency, cost recovery, and consumer protection for the 2027–2032 period.

10/23/20263 min read

SUMMARY

WHAT IT IS

This Resolution adopts the Revised Rules for Setting Electric Cooperatives’ Wheeling Rates, updating the regulatory framework for on-grid ECs to address regulatory gaps from 2012–2026 and establishing new methodologies for rate setting from 2027 onwards.

  • On-grid Electric Cooperatives

  • NEA

  • PHILRECA

WHO IS AFFECTED

KEY DEADLINES

  • Rules take effect 15 days after publication.

  • ECs must file a rate application within 20 days from effectivity for rate translation, covering the 2027–2032 regulatory period.

  • Annual data submission due every 1st working day of August (starting 2027).

  • ECs have until 31 December 2027 to file TGP applications for the lagged period.

TAKEAWAY

  • ECs must prepare and file rate applications and annual data reports as prescribed.

  • ECs should review their RFSC rates and CAPEX plans to ensure compliance with new requirements.

KEY POINTS
  • Scope: Applies to all on-grid Electric Cooperatives (ECs) for the setting of Distribution, Supply, and Metering (DSM) rates for the Regulatory Period 2027-2032 and subsequent six-year periods.

  • Covered Entities: All on-grid ECs organized under Presidential Decree No. 269, as amended.

  • Requirements: ECs must submit operational and financial data, including monthly consumption, revenue, customer numbers, non-power costs, circuit kilometers, peak data, audited financial statements, and regional inflation rates, by the 1st working day of August annually.

  • Thresholds: DSM Rate Caps and Reinvestment Fund for Sustainable Capital Expenditure (RFSC) Rate Caps are set per EC group, with RFSC capped at the higher of the EC’s existing RFSC rate or 22% of the group’s benchmark rate.

  • Deadlines: ECs must file a rate application within 20 days from effectivity of the Revised Rules; annual data submissions are due by the 1st working day of August; Regulatory Periods commence every six years starting 2027.

  • Compliance Obligations: ECs must file rate applications, submit required data and reports, and comply with annual rate adjustments and reporting requirements; non-compliance may result in penalties.

  • Mechanisms Introduced/Amended:

    • ECs are classified into groups using K-means clustering based on cost drivers; reclassification occurs every Regulatory Period.

    • DSM Rate Caps are determined per group and adjusted annually for inflation using regional CPI-based rates.

    • Tariff Glide Path (TGP) methodology is used for annual DSM rate adjustments, applying an index for inflation/load growth and an efficiency factor; performance incentive “S” is removed from tariff calculation.

    • RFSC utilization is restricted to Commission-approved CAPEX; additional RFSC may be approved subject to Commission evaluation.

    • Customer classes standardized as Residential, Low Voltage, and Higher Voltage; ECs may apply for additional classes with justification.

    • Rate reset and benchmark recalculation occur every six years, with public consultation prior to final determination.

  • Effectivity: Rules take effect 15 days after publication in a newspaper of general circulation or the Official Gazette; supersede existing EC rates except as otherwise provided.

DOWNLOAD FILE COPY

ERC Resolution No. 35, Series of 2026

  • Detailed policy analysis

  • Operational and compliance implications

  • Stakeholder impact assessment

  • Risk flags and ambiguities

  • Suggested next actions

PREMIUM REGULATORY ANALYSIS

Get access to:

Tags: Wheeling Rate Setting, Electric Cooperatives, DSM Rate Caps, Tariff Glide Path, RFSC, Regulatory Compliance

ConTACT US

hello@energypolicyhub.com