ERC Resolution No. 31, Series of 2026 – Adoption of the 2026 Rules of Practice and Procedure
ERC adopted the 2026 Rules of Practice and Procedure, updating and streamlining regulatory processes—including electronic filings, hearings, and dispute resolution—to enhance transparency, efficiency, and stakeholder accessibility in energy sector proceedings.
10/3/20263 min read
SUMMARY
WHAT IT IS
This Resolution adopts the 2026 Rules of Practice and Procedure (2026 RPP) of the ERC, updating and expanding previous rules to align with technological advances, digitalization, and recent laws. It establishes the procedural framework for all actions and proceedings before the ERC.
All ERC stakeholders, including Distribution Utilities (DUs), Generation Companies (GenCos), Retail Electricity Suppliers (RES), Qualified Third Parties (QTPs), Microgrid Service Providers (MGSPs), government agencies, law firms, consumers, and other parties appearing before the ERC.
WHO IS AFFECTED
KEY DEADLINES
Takes effect fifteen (15) days after publication in a newspaper of general circulation or Official Gazette.
Applies to pending proceedings upon effectivity, to the extent practicable.
Specific timelines for filings and compliance are detailed throughout the Rules (e.g., 30 days for answers, 15 days for motions for reconsideration, 60 days for pre-filing completion, etc.).
TAKEAWAY
Stakeholders must ensure e-mail registration and compliance with electronic filing protocols.
All applications, pleadings, and reports must follow the updated procedural, documentary, and service requirements to avoid rejection or delays.
KEY POINTS
The 2026 Rules of Practice and Procedure (2026 RPP) of the Energy Regulatory Commission (ERC) comprehensively govern all proceedings before the ERC, superseding previous rules and aligning with technological advances and digitalization.
Covered entities include all parties appearing before the ERC: distribution utilities (DUs), transmission utilities, generation companies (GenCos), retail electricity suppliers (RESs), qualified third parties (QTPs), microgrid service providers (MGSPs), government agencies, law firms, and all persons or entities participating in ERC proceedings.
Mandatory registration of a unique primary e-mail address (and up to four secondary addresses for juridical entities) is required for all covered entities and individuals, with filings and submissions accepted only from registered addresses.
All filings (applications, petitions, complaints, pleadings, motions, and supporting documents) must be submitted electronically via the ERC’s designated e-mail or online portal, except for specific processes governed by the Energy Virtual One-Stop Shop (EVOSS) platform, which prevails in case of inconsistency.
Pre-filing is mandatory for all applications and petitions to ensure completeness and correctness before acceptance and docketing; a case is deemed filed only upon payment of fees and issuance of a docket number.
Strict requirements for pleadings include verification, certification against forum shopping, and, for juridical persons, proof of authority for signatories; non-compliance results in rejection.
Hearings are public by default and may be conducted virtually, in-person, or hybrid; notices of hearing must be published and served as prescribed, with specific jurisdictional requirements for rate and consumer-affecting cases.
Consumer complaints are subject to a two-stage process: informal (conciliation/mediation, with use of the Consumer Complaints Ticketing System) and, if unresolved, formal (verified complaint, answer within 30 days, pre-trial, and summary procedure).
Applications for rate changes, power supply agreements, CAPEX projects, and other authorizations must comply with detailed documentary requirements as per ERC checklists and are subject to publication, notice, and reportorial obligations.
Dispute resolution procedures are established for commercial, technical, and operational conflicts among industry stakeholders, with strict pre-conditions barring petitions if the issue is already pending in another ERC application.
Compliance filings and reportorial requirements must be submitted electronically, with specific formats and verification by regulatory compliance officers; non-compliance may trigger investigation and penalties.
The 2026 RPP takes effect 15 days after publication in a newspaper of general circulation or the Official Gazette and applies to pending proceedings to the extent practicable.
DOWNLOAD FILE COPY
ERC Resolution No. 31, Series of 2026
Detailed policy analysis
Operational and compliance implications
Stakeholder impact assessment
Risk flags and ambiguities
Suggested next actions
PREMIUM REGULATORY ANALYSIS
Get access to:
Tags: ERC Proceedings, Electronic Filing, Due Process, Consumer Complaints, Dispute Resolution, Compliance Deadlines