ERC Resolution No. 19, Series of 2026 – Rules on Off-Grid Transmission Wheeling and System Operation Charges

ERC approved rules establishing the methodology for setting off-grid transmission wheeling and system operation charges, providing a regulatory framework to ensure transparent, cost-reflective pricing and support reliable electricity service in off-grid areas.

6/22/20263 min read

SUMMARY

WHAT IT IS

This document sets the methodology and rules for determining and regulating transmission wheeling and system operation charges for off-grid areas, including asset valuation, rate-setting, billing, and turnover procedures.

  • Off-Grid Transmission Network Provider

  • System Operator

  • Metering Service Providers

  • Off-Grid Distribution Utilities

WHO IS AFFECTED

KEY DEADLINES

  • Annual true-up reports and adjustment applications must be submitted to ERC as specified.

  • Billing statements must be issued within ten (10) days after each billing period; corrections must be made within specified periods (up to 90 days).

TAKEAWAY

  • Regulated off-grid entities must use the prescribed methodologies for rate applications and comply with billing, reporting, and adjustment requirements.

  • Stakeholders should prepare for compliance with new billing, settlement, and asset turnover procedures upon effectivity.

KEY POINTS
  • Scope: Applies to regulated off-grid entities authorized to provide off-grid transmission services, including Small Grid Transmission Network Provider (SGTNP), Small Grid System Operator (SGSO), and Small Grid Metering Services Provider (SGMSP).

  • Covered Entities: Regulated Off-Grid Entities, including Transco (or its concessionaire), NPC-SPUG, and other entities designated as SGTNP, SGSO, or SGMSP in off-grid areas.

  • Requirements: Entities must compute Annual Revenue Requirement (ARR) using specified building blocks (Return on Capital, Return of Capital, OPEX, Taxes) and submit rate applications to the ERC for approval.

  • Thresholds: Methodology applies to small grids with more than one Distribution Utility (DU) or Generation Company (GenCo) utilizing high or medium voltage lines, as specified by DOE Circulars.

  • Deadlines:

    • Billing statements must be issued within 10 days after the billing period.

    • Corrections to billing statements must be made within 90 days of issuance or detection.

    • Billing disputes unresolved after 30 days may be referred to the ERC.

  • Compliance Obligations:

    • Annual true-up reports on under/over recovery must be submitted to the ERC.

    • Entities must implement structured charge translation for customer groups.

    • Entities must follow prescribed billing, settlement, and dispute resolution procedures.

  • Mechanisms Introduced/Amended:

    • Establishes methodologies for setting SGTNP, SGSO, and SGMSP charges, including formulas for rate computation.

    • Introduces asset valuation and roll-forward RAB methodology for off-grid assets.

    • Provides for charge adjustments due to interconnection, significant load/generation changes, or force majeure events.

    • Mandates asset turnover and compensation procedures upon interconnection with the Main Grid.

    • Sets out billing, payment, interest, and dispute resolution processes specific to off-grid transmission customers.

  • Other Provisions:

    • ERC may amend or grant exceptions to the rules as necessary.

    • VAT is charged separately on top of approved rates.

DOWNLOAD FILE COPY

ERC Resolution No. 19, Series of 2026

  • Detailed policy analysis

  • Operational and compliance implications

  • Stakeholder impact assessment

  • Risk flags and ambiguities

  • Suggested next actions

PREMIUM REGULATORY ANALYSIS

Get access to:

Tags: Off-Grid Wheeling, System Operation Charges, Asset Valuation, Rate-Setting, Billing & Settlement, True-Up Mechanism

ConTACT US

hello@energypolicyhub.com